The first section, from Xining to
格尔木 (Golmud), opened in 1984; the line on to Lhasa followed in 2006. It tops out at 5,072 metres at the Tanggula Pass (
唐古拉山口), long stretches are built on
冻土 (permafrost), and the carriages are supplied with extra oxygen.